Most pool builds follow the same basic steps. What separates a high-quality pool from a cheap one comes down to the details underneath the surface: pipe size, rebar spacing, how the concrete cures, the strength of the shell, and who does the work.
I’m Ryan Lesperance, a Florida Certified Pool/Spa Contractor with Clear Tech Pools. Our team has built and serviced pools across Tampa Bay for more than 30 years. That history has shown us how these construction choices perform years down the road. In this guide, we walk you through what to look for when you compare builders.
The New Pool Construction Process and Where Builders Cut Costs
The new pool construction process runs in a set order:
- Design
- Permitting
- Excavation
- Steel placement
- Plumbing
- Shell creation
- Tile and deck installation
- Finishing
- Filling
- Final handover
While these steps stay the same from builder to builder, the standards applied at each one can vary quite a bit. For example, gunite sprayed over a steel frame forms the permanent shape of the walls and floor. The decking then connects the finished pool to your backyard.
Behind each of these steps sits a specific measurement or standard. Each one gives a builder a chance to choose a cheaper option that stays hidden on handover day.
Plumbing is a good place to start. Undersized pipes push water through a smaller opening, which forces your pump to work harder to keep water moving through the filtration system.
Over time, that extra strain means the pump wears out sooner, which raises your maintenance costs. Rebar follows the same pattern. Thin or widely spaced bars leave the shell less able to resist ground movement, which can lead to structural cracks a few years later.
The shell can hide shortcuts as well. A concrete shell sprayed to a lower strength looks the same as a strong one while it’s wet. The same goes for the ground under your deck. If a builder skips soil compaction, the surface can settle and lose its drainage slope after a few heavy summer rainstorms.
The good news is that every one of these shortcuts shows up in the written specifications. That’s why it helps to ask for those specs during the proposal stage, when you can still compare builders side by side ahead of signing a contract.
Shell, Steel, and Plumbing Specifications for a New Pool
A durable pool relies on precise measurements and proven building methods, which is why we set specific metrics for every project. Here are the numbers your pool’s long-term performance depends on.
- Shell strength: Our concrete shells are sprayed to a minimum of 4,000 PSI. Our concrete partners apply the gunite under air pressure over the steel frame, which forms a solid, continuous structure.
- Curing the shell: The products we use cure without a daily watering schedule, so there are no watering duties for you while the shell sets.
- Steel framework: We frame every pool with #3 rebar, which measures 3/8 inch in diameter, and we set the bars 10 inches apart.
- Plumbing: Because plumbing is engineered for your pool’s specific design, pipe sizes vary from one project to the next. A typical build uses 2- to 3-inch pipes buried in 18-inch trenches. Our technicians pressure-test every connection at rough-in and then leave the system under pressure through the rest of the build. That way, any pressure drop shows up on the gauge while the trenches are still open. This is the easiest and least expensive time to fix an issue.
- Equipment pad: Our standard equipment pad measures 3 feet by 3 feet, and builds with a heater get a second pad. Both pads are hurricane-rated to keep your pumps, filter, and heater secure during storm season.
- The crew: Our contracted partners handle the dig and the concrete shell. From there, our own employees complete the surfaces, tile, decking, and most of the remaining work.
You can track each of these metrics against your own build with our new pool construction checklist.
How the Local Water Table Affects Your Pool Construction
Groundwater sits high across much of Pinellas and Hillsborough counties, and coastal sites around St. Petersburg often sit on sandy soil as well. Together, these conditions create a risk that’s worth understanding at the start of your project.
The risk comes from the fact that an empty pool is a hollow shell resting in wet ground. If the groundwater outside pushes up harder than the weight of the pool pushes down, the shell can lift out of the ground. This problem is known as popping.
To prevent popping, we fill your pool as soon as the interior finish is done. The finish needs water to cure properly anyway, so the fill does both jobs at once. We also balance your water chemistry during that same startup.
The water table also shapes the earlier stages of your build. During the design phase, we test the soil density, sand content, and any buried rocks to find out whether your yard needs extra reinforcement or a dedicated drainage system.
When those tests point to a high water table, we install a well point system during excavation. The well points pump groundwater away from the hole so it stays dry while the steel goes in and the shell is sprayed.
Since every site is different, we assess each one based on its soil and its municipality’s requirements to decide whether a well point is needed. If your property sits in a flood zone, your local building department will also flag any added requirements during permitting.
County Inspections From Steel to Finished Pool
Your project pauses at a few points so a county inspector can check the work, and each visit focuses on a different part of the build.
- Steel inspection: The inspector checks the open rebar grid for bar size, spacing, and coverage. They also look at the added reinforcement at high-stress areas such as corners and steps.
- Deck and safety inspection: This visit confirms that your yard is graded so water drains away from the pool and your home. The inspector also verifies the required safety features.
- Final inspection: The inspector reviews the equipment, the electrical bonding that prevents shocks, and the finished safety barrier. Once your pool passes, your family can start swimming.
If an inspection fails, it costs you time rather than money, because we fix the issue and schedule a re-inspection. That’s also why we leave our work uncovered until the county signs off on it.
Dividing Project Responsibilities
Agreeing on who does what at the start of the project helps prevent problems later on. Here’s how the work is divided.
On our side, the team handles the county paperwork. That includes submitting the engineered drawings and site plans, scheduling inspections, and coordinating with the building department until the permit is approved. Florida law requires permits prior to breaking ground, so this step always comes first.
On your side, you’ll handle approval from your homeowners association, since the association works on its own timeline. You’ll also cap your irrigation lines and move any landscaping out of the work area ahead of the dig, because the excavation equipment needs room to get in and out.
Of these tasks, starting your homeowners association approval early is the most useful step you can take to keep your project on schedule. It’s the one approval our team can’t push through for you.
The Upcoming Code Change on December 31
Pools permitted today fall under the 2023 Florida Building Code (8th Edition), which took effect on December 31, 2023. The next update, the 9th Edition, is scheduled to take effect on December 31, 2026.
That timing matters because getting a permit in Pinellas and Hillsborough counties usually takes anywhere from a few weeks to a couple of months, depending on the season. If you sign a contract soon, your permit might be reviewed under the current code while construction runs into the next cycle.
Each city also handles this transition its own way. If you’re starting a build near the end of the year, it’s worth asking your contractor which edition your permit will fall under.
Understanding Florida’s Safety Requirements
Under the Residential Swimming Pool Safety Act (Chapter 515 of the Florida Statutes), every new residential pool in Florida must have at least one of the following safety features:
- A barrier that meets section 515.29 requirements
- An approved safety pool cover
- Exit alarms on all doors and windows that lead directly to the pool, rated to sound at a minimum of 85 decibels from 10 feet away
- Self-closing, self-latching devices on those same doors, with the release placed at least 54 inches high
- A certified pool alarm that meets ASTM International Standard F2208
If you choose a physical barrier such as a fence, it has to stand at least four feet tall on the outside with no footholds for climbing. Its gates must also open outward, close on their own, and latch automatically.
Questions to Ask Any Pool Builder
The questions below come straight from the standards in this guide. Take the list to every company you interview, including us.
- What compressive strength do you spray the shell to?
- How does your shell cure, and will I need to water it?
- What size and schedule is your plumbing, and how do you determine the sizing?
- Do you leave the plumbing under pressure while the rest of the pool is built?
- What do you use for groundwater management, and is it standard on every build?
- Which parts of the job are done by your own employees, and which are handled by subcontractors?
- What size rebar do you use, and how far apart is it spaced?
- Who handles the homeowners association approval, and what am I responsible for?
A builder who can answer all eight from memory knows their construction standards well. If a builder struggles with them, that’s a good reason to take a closer look at their proposal.
Frequently Asked Questions
How Long Does a Custom Concrete Pool Take to Build?
The timeline depends on how complex your design is and how busy the county permit office is. Permitting is usually the biggest variable. During the design phase, we’ll give you a timeline based on your specific plan.
When Is the Best Time of Year to Start a Pool Build in Tampa Bay?
Starting in the fall or winter gives your family the best chance of swimming by summer. Permit offices tend to get busy in the spring as homeowners rush to beat the heat. On top of that, the rainy season from June through September often slows digging and shell work. By starting in the cooler months, you can stay ahead of both of these bottlenecks.
Do You Build Fiberglass or Vinyl Liner Pools?
We focus on custom concrete pools, which lets us shape the geometry, depth, and features to fit your property.
What Should I Expect During Excavation and Shell Application?
The pool construction process includes various stages such as excavation, shell application, and final inspections. The excavation phase involves digging a large hole for the pool. You will notice heavy machinery moving around your house, so it is a good idea to let your neighbors know ahead of time. In tight backyards, smaller equipment may be called in to do the job.
How Do You Handle Groundwater and Soil Conditions?
Pools must be designed considering local soil conditions for structural integrity and safety. For example, building a swimming pool in St. Petersburg requires careful planning due to high water tables.
To handle this, excavation should be 12 inches deeper for sump pump installation. We install a sump pump to manage groundwater buildup, and a hydrostatic valve releases groundwater pressure under the pool. Remember, never leave your pool empty to avoid groundwater lifting the shell.
When Should I Choose Finishes and Landscaping?
Pool colors, finishes, and features should be carefully selected during the design phase to ensure they match your vision. Whether you prefer traditional tile, exposed aggregate, or a modern plaster alternative, making these choices early prevents delays. Additionally, landscaping and outdoor features should be planned together with pool construction so the post-build site flows perfectly.
What Are the Key Plumbing and Finishing Details?
Pools require specific plumbing for main drains, skimmers, and lights prior to being filled. As we wrap up the structural work, mastic is applied to seal joints between the deck and coping. This important seal helps prevent water intrusion and cuts down on long-term maintenance.
What Are the Safety and Inspection Requirements?
Final city inspections are required at multiple stages of construction for safety compliance. Florida’s Residential Swimming Pool Safety Act mandates safety barriers and alarms to protect children. In fact, Florida law requires a compliant safety barrier before a pool can be filled. All of these requirements must be properly addressed before the final handover.
Should I Include Automation Systems?
Yes, modern builds often incorporate automation systems that make it incredibly easy to operate your pool. You can expect to control your pumps, heating, and lighting straight from your smartphone or dedicated control panels rather than walking out to the equipment pad.
Can I Watch the Pool Being Built?
Yes, and the steel and gunite days are the best times to be home. Both stages happen out in the open. They also give you the only chance to see the steel framework while it’s still exposed.
What Is the Difference Between Gunite and Shotcrete?
Both are concrete applied through a hose under air pressure over a steel frame. The main difference is in how they’re mixed. Gunite is a dry mix of cement and sand that meets water at the nozzle, while shotcrete is mixed with water ahead of time. Either method reaches the strength we specify, so the skill of the crew at the nozzle is what matters most.
Start Planning Your Custom Pool With Clear Tech Pools
Clear Tech Pools has served the Tampa Bay area for more than 30 years. In that time, our team has grown to support 2,600 residential customers and 329 commercial clients, with over 275,000 service visits completed. We cover Pinellas, Hillsborough, and Sarasota counties.
Because we both build and service pools, we know how early construction choices affect a pool a decade later. That experience is why we build to these specifications. If you’re ready to plan your custom pool, get in touch with us and bring the eight questions along.